Our new facility

  • Home
  • Our new facility
Our Facility

A brand-new building
for enhanced production capabilities

Step International has invested in a brand-new 900 m² facility located at 17 rue Édouard Garet in Andrézieux-Bouthéon, on the outskirts of Saint-Étienne. This new site was designed to bring significant improvements to our operations and services, including:

More efficient storage solutions
Improved safety for our teams with new storage racks and adapted handling equipment
A new loading dock for greater flexibility in inbound and outbound logistics
A building insulated according to the latest standards, reducing our environmental impact
A cleaner, controlled environment to meet the highest quality requirements
Enhanced working conditions to increase overall efficiency
Partial energy autonomy and a reduced carbon footprint through photovoltaic panels
Energy

A facility designed
for energy self-consumption

Step International has installed 254 solar modules, generating a total power output of 113.03 kWp to support energy self-consumption.

Avoided emissions: 49 tons of CO₂ equivalent*


*Amount of greenhouse gases that would have been emitted over the same period if the electricity had been produced using conventional means (20 g CO₂ eq/kWh)

This new facility expands our capabilities across several key processes, including: unwinding / rewinding, slitting, adhesive coatingand lamination.